Public Works Bond Requirements Under the Miller Act and in California, Texas, Arizona and Nevada

Public works contracts require bonds by statute: federal construction contracts over $150,000 need performance and payment bonds under the Miller Act as the FAR applies it, California requires a 100 percent payment bond on public works over $25,000, Texas requires a performance bond over $100,000 and a payment bond over $25,000 ($50,000 for cities) and Arizona requires both bonds at the full contract amount on covered public contracts regardless of size. Bid security, performance bond amounts and surety qualifications vary by owner type, and agencies can add requirements in their bid documents. In each state the bonds are surety credit the contractor and its indemnitors repay, not insurance.

A performance and payment bond form on a desk with rolled drawings and a fountain pen, carrying a gold surety seal, a mid-rise building under construction behind it

Key Decision Points

  1. Thresholds differ: $150,000 for federal bonds under the FAR, $25,000 for California payment bonds, $25,000 to $100,000 in Texas depending on bond and owner and no dollar floor in Arizona's statute.
  2. Performance and payment bonds are typically 100 percent of the contract amount, though federal and California performance amounts can be set by the officer or agency.
  3. Each jurisdiction restricts who may write the bond: Treasury-listed sureties federally, admitted surety insurers in California and sureties authorized in Texas or holding an Arizona certificate of authority.
  4. Texas, Arizona and Nevada bar an agency from requiring a particular surety, agent or broker.
  5. Retention, bid security and subcontractor bond requirements ride alongside the statutory bonds and shape the contractor's cash and capacity.

Why Public Work Is Bonded by Statute

Public owners require bonds because the usual private remedies do not work against public property. A subcontractor or supplier generally cannot record a mechanic's lien on a city street or a federal building, so legislatures substitute a payment bond that unpaid claimants can sue on. A performance bond protects the public owner, which cannot easily absorb the cost of finishing a job a contractor abandons. Bid security completes the set by making sure the low bidder stands behind its number.

Because the bonds come from statute, the statute controls even when the bond form says something different. Arizona deems every bond given under its public works article to be in the statutory form regardless of its actual wording, and Texas disregards any provision in a bond furnished to comply with Chapter 2253 that expands or restricts the rights the chapter creates. Contractors and sureties should read the statute first and the bond form second.

Federal Projects: The Miller Act and the FAR Thresholds

The Miller Act, 40 U.S.C. §3131, requires performance and payment bonds before award of a federal construction contract of more than $100,000 as written in the statute. The Federal Acquisition Regulation applies the requirement to construction contracts exceeding $150,000, and for contracts greater than $35,000 but not greater than $150,000 the contracting officer selects two or more alternative payment protections. Contractors should read the threshold in the solicitation, which reflects the FAR in force when it is issued.

The performance bond is in an amount the contracting officer considers adequate; FAR 28.102-2 sets it at 100 percent of the original contract price plus 100 percent of any increase unless the officer determines a lesser amount is adequate. The payment bond equals the total amount payable unless the officer finds that amount impractical in writing, and it may not be less than the performance bond. A bid guarantee of at least 20 percent of the bid, capped at $3 million, is required whenever a performance bond is.

Federal work also restricts the surety. Under FAR 28.202, corporate sureties on contracts performed in the United States must appear on the Treasury Department's Listing of Approved Sureties (Circular 570), and a bond's penal amount should not exceed the surety's listed underwriting limit unless the excess is coinsured or reinsured within each participant's limit. Large federal bonds therefore sometimes carry co-sureties.

California: Payment Bonds by Statute, Performance Bonds by Agency

California's statewide rule is the payment bond. Under Civil Code §9550, a direct contractor awarded a public works contract involving more than $25,000 must give a payment bond before work begins, and the agency must say so in its call for bids. Section 9554 sets the bond at not less than 100 percent of the total amount payable, requires a bond rather than a deposit in lieu of a bond and requires an admitted surety insurer. State entities follow a parallel rule in Public Contract Code §7103, with the same $25,000 threshold and 100 percent amount.

Performance bonds and bid security are set by the code that governs each type of agency. County construction contracts under Public Contract Code §20129 require bidder's security and a faithful performance bond approved by the board, general law cities require bidder's security of at least 10 percent and special districts, school districts and charter cities follow their own codes and charters. Code of Civil Procedure §995.311 adds that any bond required on a public works contract must be executed by an admitted surety insurer, and the approving agency must verify that status.

Texas: Chapter 2253 Thresholds and Owner Protections

Texas Government Code §2253.021 requires a governmental entity to obtain bonds from the prime contractor before work begins: a performance bond if the contract exceeds $100,000, and a payment bond if it exceeds $25,000, or $50,000 when the entity is a municipality or a qualifying joint board. Both bonds are in the amount of the contract. The performance bond protects only the governmental entity, and the payment bond protects beneficiaries with a direct contract with the prime contractor or a subcontractor.

The chapter also regulates the bond itself. Bonds must be executed by a corporate surety under the Texas Insurance Code, a bond on a state contract must be payable to the state with a form approved by the attorney general and a bond for any other entity must be payable to and approved by that entity. The bond must display where claim notices go. An entity may not require a contractor to use a specific surety, agent or broker. A reverse auction may not be used for services on a bonded public work contract.

Two provisions shift risk to the owner. If an entity fails to obtain a required payment bond, §2253.027 makes it liable as a surety would have been. And when an insurer settles a covered loss by arranging replacement work rather than paying cash, §2253.022 requires the entity to ensure performance and payment bonds are furnished for that work. Counties may also require a 5 percent bid bond on public works under Local Government Code §262.032.

Arizona: Full-Amount Bonds on Every Covered Contract

Arizona's statute has no dollar threshold of its own. Except where another statute exempts the work, A.R.S. §34-222 requires the contractor to furnish a performance bond and a payment bond, each equal to the full contract amount, before any contract is executed for public buildings, public works or improvements of counties, cities, towns and a long list of districts. The bonds become binding on award, must include a prevailing-party attorney fee provision and are filed with the contracting body.

The surety rules are strict. Bonds must be executed by a surety company holding a certificate of authority from the Arizona Department of Insurance and Financial Institutions rather than by individual sureties. An invitation for bids may not require a particular surety, agent or broker. If the prime contract requires subcontractors or suppliers to furnish bonds, the same surety qualification applies to them.

Bid security and retention sit beside the bonds. A.R.S. §34-201 requires a certified check, cashier's check or surety bond for 10 percent of the bid. Under §34-221, the agent retains 10 percent of each progress estimate, with half of the retained amount released on the contractor's request at 50 percent completion and no more than 5 percent withheld afterward if progress is satisfactory, and the contractor may substitute qualifying securities for cash retention.

Nevada: Bonds Over $100,000 at a 50 Percent Floor

Under NRS 339.025, a contractor awarded a Nevada public works contract over $100,000 by the State, a county, city, town, school district or other public agency must furnish a performance bond and a payment bond, each in an amount the agency fixes but not less than 50 percent of the contract amount, from a surety authorized to do business in Nevada. The section does not stop an agency from requiring bonds on smaller work, and NRS 339.065 makes it a misdemeanor for an agency to require a particular surety, agent or broker.

Highway work follows a different chapter. NDOT contracts are excluded from chapter 339 and run under NRS chapter 408, which calls for at least 5 percent bid security and full-amount bonds, with the performance bond kept in force for one year after completion. A sub-supplier with no contract with the prime must serve a written notice within 30 days after first furnishing labor or material to keep its payment bond claim under NRS 339.035.

The Five Rule Sets Side by Side

Public Works Bond Rules Side by Side
Rule setPerformance and payment bondsBid securitySurety
FederalPerformance and payment bonds over $150,000 under the FAR (the statute says $100,000); alternative payment protections from more than $35,000 through $150,000Bid guarantee of 20 percent up to $3 millionTreasury-listed surety
CaliforniaPayment bond over $25,000 at no less than 100 percent; performance bond by agency codeBid security by agency code, with general law cities at least 10 percent bid securityAdmitted surety insurer
TexasPerformance bond over $100,000 and payment bond over $25,000, or over $50,000 for municipalities, each in the contract amountOptional 5 percent county bid bondCorporate surety under the Insurance Code
ArizonaPerformance and payment bonds at the full contract amount on covered contracts, with no statutory dollar floor10 percent bid securitySurety with an Arizona certificate of authority
NevadaPerformance and payment bonds on contracts over $100,000, each in an amount the agency fixes but not less than 50 percent of the contract; full-amount bonds on NDOT highway contracts5 percent bid security on NDOT highway contractsSurety authorized in Nevada
Public work only. Subcontracts, wrap-up projects, private projects and master agreements set their own bond terms by contract.

The figures below come from the statute or regulation text and describe public work only. Local agencies frequently add bid security, maintenance bond or insurance requirements, and the bid documents control the specific job.

When a project is funded by more than one source, such as a city street project with federal highway dollars, the bid package may layer requirements from each. Read the special provisions for the funding source before assuming the state statute is the whole answer.

Planning Bonding Capacity for a Public Works Pipeline

Every bonded public job uses the contractor's surety capacity from bid to release, and the release can lag acceptance by months while the agency processes final payment, retention and any warranty period. Contractors moving from private work into public bidding, or from one state to another, should map their bid calendar against their single and aggregate limits before the first bid bond request.

Subcontractor bonds matter on the same timeline. A prime contractor that bonds 100 percent of the contract to the agency carries the payment risk for every tier below it, so many primes require bonds from site work, utility and structural subcontractors on large packages. On Arizona work, those subcontractor bonds must meet the same certificate-of-authority rule as the prime's bonds.

Before You Ask for a Quote

What to Gather

  • The bid package's bond, bid security and insurance sections for each public job
  • The agency type (federal, state, county, city, district or school) and funding sources
  • The required bond forms and obligee names
  • Retention terms and any substitute security options
  • The current work-in-progress schedule and bid calendar for the next two quarters
  • Subcontractor bond requirements you intend to pass down

What to Ask the Insurer or Surety

  • Which statute sets the bond threshold and amount for this agency, and does the bid package add to it?
  • Is our surety admitted in California, authorized in Texas, licensed in Arizona or Treasury-listed, as each job requires?
  • Does the federal penal sum exceed the surety's Treasury underwriting limit, and if so, how will the excess be coinsured or reinsured?
  • How will winning every open bid affect our aggregate limit?
  • Which subcontractors should be bonded to us, and on whose form?
  • When will each bond be released after acceptance, retention payment and any warranty period?
Quick Answer

Federal construction contracts over $150,000 need performance and payment bonds under the FAR; California requires a 100 percent payment bond over $25,000; Texas requires a performance bond over $100,000 and a payment bond over $25,000, or $50,000 for cities; Arizona requires both at the full contract amount on covered work.

Common Mistake

Assuming a small Arizona contract is too small to bond. A.R.S. §34-222 sets no dollar floor, so a $90,000 town project can need full-amount performance and payment bonds and a 10 percent bid bond.

Broker Perspective

A broker reads the statute, the agency's bid documents and any funding-source provisions together, confirms the surety's qualification for that owner and state, and maps the whole bid calendar against the surety program before the first bond request.

Coverage Impact

Statutory bonds do not transfer the contractor's risk; claims paid by the surety are typically owed back under the indemnity agreement. Insurance requirements in the same bid package are separate, and whether a policy responds to a given loss depends on its wording.

Questions Buyers Ask

Why does the Miller Act say $100,000 when federal solicitations say $150,000?

The statute's text at 40 U.S.C. §3131 states $100,000, while FAR 28.102-1 applies the performance and payment bond requirement to construction contracts exceeding $150,000 and uses alternative payment protections between $35,000 and $150,000. Federal solicitations follow the FAR in force when issued, so read the threshold stated in the solicitation itself.

Can a California agency accept a cash deposit instead of a payment bond?

Not for the statutory payment bond. Civil Code §9554 requires the payment bond to be in the form of a bond, not a deposit in lieu of a bond, executed by an admitted surety insurer. Bid security is different: city and county bidders may use cash, a cashier's or certified check or a bidder's bond.

Can a Texas city tell us which surety or agent to use?

No. Government Code §2253.021(g) bars a governmental entity from requiring a contractor to obtain a surety bond from any specific insurance or surety company, agent or broker. The entity does approve the form of the bond, and the surety must be a qualified corporate surety under the Texas Insurance Code.

Is there a contract size below which Arizona public work needs no bonds?

A.R.S. §34-222 sets no dollar threshold. Unless another statute exempts the work, the contractor furnishes performance and payment bonds at the full contract amount before a covered public contract is executed. Small agencies sometimes use other procurement methods or exemptions, so check the specific solicitation and the exemption it relies on.

What happens if a Texas agency forgets to require a payment bond?

Under Government Code §2253.027, the agency becomes subject to the same liability a surety would have had on the bond, and payment bond beneficiaries are entitled to a lien on money due the prime contractor. Claimants give notice to the agency as if it were the surety. That rule protects subcontractors but does not relieve the prime contractor of its payment obligations.

Official Sources

  1. NRS 339.015, 339.025 and 339.065 (contracting body; performance and payment bonds; no required surety or agent), Nevada Legislature. Contracting body definition; bonds on contracts exceeding $100,000 except chapter 408 contracts; binding on award; 50 percent minimums; State Public Works Division subcontractor bonds over $50,000 or 1 percent; Nevada-authorized sureties; payee and filing; agencies may still require bonds; misdemeanor to require a particular surety, agent or broker. Verified 2026-10-25.
  2. NRS 339.035, 339.045 and 339.055 (payment bond claims, certified copies, venue and limitation), Nevada Legislature. Right to sue after 90 days unpaid; 30-day and 90-day notices for claimants contracting with a subcontractor, served by registered or certified mail; certified copies on affidavit as prima facie evidence; venue where the contract is performed; one-year limitation. Verified 2026-10-25.
  3. NRS 408.333, 408.337, 408.354, 408.357, 408.363 and 408.383 (NDOT bidding, bonds, claims and retention), Nevada Legislature. Prequalification questionnaire and $25 million breach rule; 5 percent bid security forfeited after 20 days; railroad exception; full-amount bonds, one-year performance bond maintenance, labor and material bond scope with 8 percent interest, insurance proof; claims within 30 days of final acceptance and suit within six months; 5 percent retention capped at $50,000, surety approval for reductions and substitution of obligations. Verified 2026-10-25.
  4. 40 U.S.C. §3131 (Miller Act bonds), U.S. Government Publishing Office. Statutory $100,000 threshold, performance bond in an amount the officer considers adequate and payment bond equal to the amount payable and not less than the performance bond. Verified 2026-10-24.
  5. FAR Subpart 28.1 (28.101 bid guarantees; 28.102 Miller Act thresholds and bond amounts), Acquisition.gov (General Services Administration). Bonds on construction contracts over $150,000, alternative payment protections over $35,000 through $150,000, 100 percent bond amounts and 20 percent bid guarantee capped at $3 million. Verified 2026-10-24.
  6. FAR 28.202 (acceptability of corporate sureties), Acquisition.gov (General Services Administration). Corporate sureties must appear on Treasury's Listing of Approved Sureties, penal amounts within the underwriting limit unless coinsured or reinsured. Verified 2026-10-24.
  7. Cal. Civil Code §9550 and §9554 (public works payment bond threshold, amount and surety), California Legislative Information. Payment bond over $25,000 before work begins, not less than 100 percent, a bond rather than a deposit, admitted surety insurer, state entities excluded. Verified 2026-10-24.
  8. Cal. Public Contract Code §7103 (state entity payment bonds), California Legislative Information. Payment bond of not less than 100 percent on state entity public work over $25,000. Verified 2026-10-24.
  9. Cal. Code of Civil Procedure §995.311 (admitted surety on public works bonds), California Legislative Information. Any public works bond must be executed by an admitted surety insurer, verified by the approving agency. Verified 2026-10-24.
  10. Cal. Public Contract Code §20129 (county bidder's security and faithful performance bond), California Legislative Information. County construction bids require bidder's security and the awarded contractor executes a faithful performance bond approved by the board. Verified 2026-10-24.
  11. Tex. Gov. Code ch. 2253 (§2253.021, .022, .023, .027), Texas Legislature. Bond thresholds and amounts, corporate surety, payee and form approval, no required surety or agent, no reverse auctions, insured-loss replacement bonds, attempted compliance and entity liability for a missing payment bond. Verified 2026-10-24.
  12. Tex. Local Gov. Code §262.032 (county bid bond), Texas Legislature. Counties may require a 5 percent bid bond on public works or contracts over $100,000. Verified 2026-10-24.
  13. A.R.S. §34-222 (Arizona performance and payment bonds), Arizona State Legislature. Full-amount performance and payment bonds before execution, attorney fee provision, certificate-of-authority surety, no required surety or agent and subcontractor bond surety rule. Verified 2026-10-24.
  14. A.R.S. §34-201 and §34-221 (Arizona bid security and retention), Arizona State Legislature. Ten percent bid security under §34-201; 10 percent retention, reduction at 50 percent completion and substitute securities under §34-221. Verified 2026-10-24.

Reviewed by the Principal, Gleason Insurance Brokers, LLCUpdated

Bring the Contract and the Exhibits.

Share the project, the contract insurance exhibit and any bond or lender requirements. A licensed broker may review them as a courtesy when available, before anything is quoted. See how a project review works or who runs this site.

Full disclaimer about contract and insurance reviews

Contract and insurance reviews are a courtesy service that may be available at times, depending on our workload and on the size, timing and complexity of the project. A review is not guaranteed and is limited to insurance considerations. It is not legal advice and is not a substitute for advice from your own legal counsel, which you may need before signing a contract or obtaining coverage.