The Owner's Insurance Exhibit Drives the Program
Commercial owners, their lenders and their tenants each bring insurance requirements, and the owner-contractor agreement usually folds them into one exhibit. That exhibit typically lists GL and excess limits, the parties to be named as additional insureds, primary and noncontributory wording, waiver of subrogation, completed operations duration, builders risk responsibility and any pollution, professional or bond requirements.
The exhibit is a starting point, not a quote. Limits written for a 10-story office may be carried into a contract for a small retail pad, and additional insured wording copied from another state may not match local law. Compare the exhibit line by line to the policies you can buy, and negotiate mismatches before signing, when the owner still has reasons to agree.
- Limits per occurrence, aggregate and excess
- Additional insureds: owner, lender, property manager, tenant
- Completed operations duration after completion
- Builders risk: who buys, whose interests, deductible
- Bonds, pollution and professional liability requirements
Contract review from the contractor side is covered in insurance for commercial general contractors.
Indemnity and Additional Insured Limits in CA, TX, AZ and NV
California, Texas, Arizona and Nevada each restrict how far an owner can shift its own negligence to the contractor. California Civil Code §2782 makes provisions that indemnify a promisee for its sole negligence or willful misconduct void, and for private-owner contracts entered into on or after January 1, 2013, it makes provisions unenforceable to the extent of the owner's active negligence. Arizona's A.R.S. §32-1159 voids clauses that indemnify the promisee for its sole negligence.
Texas goes further. Insurance Code §151.102 makes a construction contract indemnity void to the extent it requires indemnity for the indemnitee's own negligence or fault, with exceptions such as certain employee claims. Section 151.104 then makes a contract requirement for additional insured coverage unenforceable to the same extent, while preserving provisions that list named insureds under a consolidated insurance program.
Nevada's limits are in its constructional defect statute, NRS 40.693, which reaches residential construction contracts. On a Nevada commercial project, the indemnity and additional insured terms are read under the contract itself, so the exhibit deserves the same review from counsel.
These rules do not rewrite the policy. They limit what the contract can require, which matters when an exhibit asks for additional insured coverage broader than the law allows. Counsel should confirm how the statute applies to the specific contract, and the endorsement should be read against both.
Additional insured and primary wording are part of any review of project-specific liability for commercial work.
Occupied Buildings and Tenant Improvements
Tenant improvement and renovation work happens inside or next to property someone else owns and occupies. A builders risk policy may be written for the new work only, leaving the existing structure to the owner's or landlord's property policy, and the two must agree on who pays when a fire starts in the new work and spreads. Ask whether existing property is excluded, sublimited or scheduled. Also ask whether the landlord's insurer waives subrogation against the contractor.
Occupied-building work also raises liability exposure. Tenants, patients, guests and shoppers are present, and a water intrusion or dust event can interrupt their businesses. Lease-driven requirements often name the landlord, the property manager and the lender, each with different endorsement needs.
Existing-structure, partial occupancy and soft cost terms are covered in builders risk for new and existing structures.
Healthcare, Hospitality, Retail and Mixed-Use
Healthcare projects frequently tie into operating facilities, so infection control, utility shutdowns and medical gas or imaging equipment installations shape both the schedule and the builders risk values. Hospitality projects carry heavy furniture, fixtures and equipment values late in the job, and a delayed opening can drive soft cost and delay-in-completion claims if those are written. Retail pad and center work is often fast-cycle with many tenants, and certificates for each tenant can multiply.
Mixed-use buildings combine those issues with residential units above. If the residential floors are for-sale condos, defect exposure for the whole structure rises, insurers may treat the project as residential and a wrap with a long completed operations term becomes more likely. Rental apartments above retail are usually viewed differently, though still with careful attention to water intrusion.
When upper floors are residential, compare the approach in condo and multifamily construction insurance.
How Long the Exposure Lasts: Statutes of Repose
Completed operations exposure ends, in practice, when the law stops allowing suits. California Code of Civil Procedure §337.15 bars most actions for latent construction deficiencies more than 10 years after substantial completion. Texas Civil Practice and Remedies Code §16.009 sets a 10-year limit for suits against those who construct or repair improvements, with an 8-year limit for governmental claimants. Arizona's A.R.S. §12-552 bars contract-based actions more than 8 years after substantial completion.
Those periods help set how long completed operations coverage, additional insured status for the owner and any project policy tail should run. Exceptions exist in each statute, so contract requirements often ask for completed operations to be maintained for a set number of years, and that number should be checked against what the market will offer.
Term options and gaps are explained in completed operations coverage after turnover.
Wraps, Bonds and Pollution on Commercial Work
Larger commercial projects with many trades are where owners and GCs most often weigh an OCIP or CCIP. A wrap can consolidate liability and workers' compensation under one program, but it shifts administration, enrollment and audit duties to the sponsor. On private work, performance and payment bonds are a contract choice, often required by lenders or institutional owners. A bond protects the obligee, and the contractor owes the surety indemnity if the surety pays.
Redevelopment of commercial sites often turns up old fuel tanks, impacted soil or hazardous building materials during demolition. Those exposures sit outside most GL forms, so the pollution line deserves a look even on an office or retail project.
Bond types, obligees and underwriting are explained under performance and payment bonds for commercial projects.
Before You Ask for a Quote
What to Gather
- Owner-contractor agreement and its insurance exhibit
- Lender and tenant insurance requirements that flow into the exhibit
- Project schedule, hard costs and soft cost estimates
- Existing structure details for renovation or tie-in work
- Subcontract insurance requirements and certificate tracking plan
- Any environmental reports for redevelopment sites
What to Ask the Insurer or Surety
- Does the additional insured endorsement match the exhibit and state law?
- Is existing property excluded or sublimited on the builders risk policy?
- How long will completed operations and owner additional insured status last?
- Would a wrap reduce cost or duplication at this project's size?
- Is the owner requiring performance and payment bonds, and in what form?
- Are delay-in-completion and soft costs available, and on what terms?
Quick Answer
Commercial project insurance is shaped by the owner's contract exhibit and the building type; liability, builders risk, wraps, bonds and pollution are each sized against that exhibit and state indemnity law.
Common Mistake
Signing an owner exhibit that demands additional insured coverage broader than state law allows or than any policy offers, then discovering the gap at the first claim.
Broker Perspective
A broker marks up the exhibit against available endorsements, flags anti-indemnity issues for counsel and settles builders risk responsibility for existing structures early.
Coverage Impact
Coverage typically depends on the endorsement wording, the builders risk treatment of existing property and how long completed operations is maintained after completion.
Questions Buyers Ask
The owner's contract wants us to name them as additional insured for their own negligence. Can we do that?
It depends on the state and the form. Texas Insurance Code chapter 151 makes such requirements unenforceable to the extent of the owner's own fault in most construction contracts, and California and Arizona limit indemnity for an owner's sole or active negligence. Have counsel review the clause and compare it to the endorsement your insurer offers.
Who should insure the existing building during a tenant improvement job?
Usually the building owner's property policy remains primary for the existing structure, while builders risk or an installation floater addresses the new work. The lease and contract should say so, and both insurers should waive subrogation where possible. Without that alignment, a fire in the new work can trigger a dispute between the two policies.
How many years after completion can a commercial owner still sue the builder?
Generally up to the statute of repose: about 10 years for latent deficiencies in California and for most claimants in Texas, and 8 years for contract-based actions in Arizona. Each statute has exceptions, so completed operations and owner additional insured requirements should be checked against the governing law with counsel.
Are performance bonds required on a private commercial building?
Not by statute on most private work, but owners and lenders often require them by contract. The bond protects the owner as obligee rather than the contractor, and the contractor signs an indemnity agreement with the surety. Surety capacity depends on the contractor's financials, work in progress and backlog.
Official Sources
- NRS 40.645, 40.646, 40.6472, 40.649 and 40.693 (constructional defect actions), Nevada Legislature. Pre-suit notice, 30-day forwarding, 90-day response, insurer duties, indemnity limits and wrap-up disclosures for residential contracts after February 24, 2015 Verified 2026-10-25.
- Cal. Civil Code §2782 (construction contract indemnity), California Legislative Information. Sole negligence indemnity void; private-owner contracts on or after January 1, 2013, unenforceable to the extent of the owner's active negligence. Verified 2026-10-23.
- Tex. Ins. Code §§151.102, 151.104, Texas Legislature. Indemnity for the indemnitee's own negligence is void to that extent; additional insured requirements unenforceable to the same extent, with a consolidated insurance program exception. Verified 2026-10-23.
- A.R.S. §32-1159 (construction indemnity agreements), Arizona State Legislature. Clauses indemnifying the promisee for its sole negligence in construction contracts are void. Verified 2026-10-23.
- Cal. Code Civ. Proc. §337.15 (latent deficiency repose), California Legislative Information. No action for latent deficiencies more than 10 years after substantial completion. Verified 2026-10-23.
- Tex. Civ. Prac. & Rem. Code §16.009, Texas Legislature. 10-year limit for suits against persons who construct or repair improvements; 8 years for governmental entities. Verified 2026-10-23.
- A.R.S. §12-552 (development and construction actions), Arizona State Legislature. Contract-based actions barred more than eight years after substantial completion. Verified 2026-10-23.
Reviewed by the Principal, Gleason Insurance Brokers, LLCUpdated