California right of way

California Encroachment Permit Bonds: Caltrans, Cities and Counties

Caltrans guidance calls for a performance bond of at least 50 percent and a payment bond of 100 percent of the estimated cost of privately funded work in the state highway right of way, with the State as sole obligee, and it does not accept letters of credit or property bonds. Public utilities and authorized local agencies are generally not required to bond, but their contractors and private developers usually are. California cities and counties run separate street-work and excavation permit programs with their own thresholds, forms and contractor rules, so the security for a city street can look nothing like the Caltrans requirement on the highway next to it.

A project bonds form on a desk beside rolled drawings and a pen, carrying a gold surety seal, with a city skyline and a building under construction behind it

Key Decision Points

  1. Caltrans: 50 percent performance and 100 percent payment bonds on the estimated cost of work in the state right of way, State as sole obligee.
  2. Caltrans does not accept letters of credit or property bonds; cash only for low-risk non-public works encroachments.
  3. Signal and structure work on private permits carries a performance bond of at least $10,000, held until as-builts.
  4. San Diego requires surety on right-of-way permits above its cost threshold and sets rating and release rules.
  5. Los Angeles limits sewer permits in the right of way to contractors on its bonded sewer contractor list.

Caltrans: What the Encroachment Permits Manual Requires

Caltrans issues encroachment permits through its district offices, and Section 203.4 of its Encroachment Permits Manual sets the bonding rules. Surety bonds secure faithful performance of the permittee's obligations. The performance bond secures completion of the permitted work in compliance with the plans, specifications and permit conditions. The payment bond secures payment by the contractor to its own labor, subcontractors and material suppliers.

For privately funded projects without a highway improvement agreement, the manual says either the developer or the contractor, preferably the developer, is bonded at 100 percent for the payment bond and 50 percent for the performance bond of the estimated construction cost of the work inside the state highway right of way, and the bonds name only the State as obligee. Public works encroachments costing $5,000 or more should be bonded, and non-public works encroachments may be bonded at the district permit engineer's discretion. Caltrans uses its own forms: the performance bond (TR-0001) and payment bond (TR-0018).

Caltrans: Accepted Forms, Signals and Exemptions

Caltrans states that letters of credit and property bonds are not acceptable forms of bonding. A cash deposit is generally acceptable only for non-public works encroachments where latent defects are unlikely, such as landscaping or driveways, and refunds of cash deposits above $10,000 generally need Department of Finance approval under Government Code §13144. For a developer used to posting a letter of credit with a city, that rule usually means arranging a surety bond for the highway portion of the frontage work.

Performance bonds on privately funded work involving new traffic signal equipment or highway structures may not be less than $10,000 and are retained until the permittee furnishes accurate as-built plans. Bonding is not required of a local public entity authorized by law to maintain facilities in a state highway and is not normally required of a public utility, citing Streets and Highways Code §678 and §679. A contractor working for a local agency in good standing does not need separate Caltrans bonds when it furnishes bonds to that agency for at least 100 percent of the project, but that provision does not extend to private-entity work.

Caltrans: Claims, Release and the Year After Acceptance

The manual describes how Caltrans uses the bond. If a permittee does not correct work after final inspection, the district notifies the bond company to perform the necessary work, and if the surety does not, the district may do the work and seek its costs from the bond company, contractor or permittee. Caltrans also tries to collect overdue permit fees from the bonding company before sending an account to collections.

Release follows paperwork. Fees under the actual-cost method are collected before the bond is released, utility and private permittees must submit accurate as-built plans before bonds are released, and the manual notes that most performance and payment bonds expire a year after Caltrans accepts the work. The same section cites California's limits for suits on patent defects (Code of Civil Procedure §337.1) and latent defects (§337.15), a reminder that the permittee's exposure for highway work can outlast the bond itself.

Caltrans: Insurance and Cal/OSHA Conditions on the Permit

The encroachment permit general provisions hold the permittee responsible for liability for personal injury and property damage. Caltrans requires liability insurance by name for commercial filming, special events, unmanned aircraft and tower cranes, and when insurance is required the applicant must obtain an endorsement naming the State of California and the department, its directors, officers, employees and agents as additional insureds and furnish the certificate and endorsement.

The manual also points permittees to Labor Code §6500: where the work involves trenches or excavations five feet or deeper that a person must enter, or other listed operations, the permittee needs a Cal/OSHA permit before starting. A broker review of a Caltrans permit therefore looks at three things together: the bond forms and amounts, the additional insured wording against the contractor's general liability endorsement, and whether the scope triggers the Cal/OSHA permit that underwriters may ask about.

City Example: San Diego's Right-of-Way Permit Surety

Cities set their own programs, and San Diego shows how detailed they can be. Information Bulletin 126 lists public right-of-way permits under San Diego Municipal Code §129.0702 among the approvals that require a bond or other surety. Under §129.0119 and department practice, no surety is required for standard public improvement right-of-way permits on a construction plan template, projects with a construction cost estimate under $100,000 or permits issued to a government agency.

The amount comes from a construction cost estimate prepared by a California-licensed civil engineer on the City's latest unit price list and approved by the Development Services drainage and grades reviewer. The City accepts performance bonds, cash bonds, improvement agreement bonds and letters of credit, requires its own bond form (DS-401) and requires the surety to hold an A-category rating from at least one nationally recognized rating organization. Bonds stay in force until as-builts or as-graded reports are approved and the permit is closed, and a partial release may not exceed 75 percent of the cost estimate.

City Example: Los Angeles' Bonded Sewer Contractor List

Los Angeles uses a different model for sewer work. Under Los Angeles Municipal Code §64.15, only approved bonded sewer contractors may obtain sewer permits for construction in the public right of way, and approval lasts one year. The Bureau of Engineering's package asks for evidence of general liability insurance through the City's insurance submittal system, a sewer and storm drain connection surety bond or a cash bond in the amount set by LAMC §64.15.1(b), a contractor license in the A, B, C-36 or C-42 classification and current City business tax registration. The package states the bond amount increases to $38,000 effective July 1, 2026.

This is an annual eligibility bond, not a project bond. A water and sewer contractor that wins lateral or connection work in Los Angeles needs the bond, insurance and license documents current before the first permit, and needs to renew them each year. Counties and other cities in the region run their own programs, so a contractor on the Los Angeles list still checks each jurisdiction's permit conditions.

Planning One Project Across Caltrans and a City

Frontage improvements often straddle jurisdictions: a signal and turn pocket on a state route, a driveway and storm drain connection on a city street and a lateral tied into a sewer district main. Each agency issues its own permit with its own security, and the forms do not substitute for one another. A letter of credit the city accepts will not satisfy Caltrans, and a Caltrans payment bond will not satisfy the city's surety requirement.

When the frontage work is also a condition of a final map, the city may secure it through the subdivision improvement agreement rather than a stand-alone permit bond. Sorting out which instrument covers which piece of work before submitting applications helps the developer's surety see the full set of obligations at once instead of one request at a time.

Before You Ask for a Quote

What to Gather

  • The Caltrans encroachment permit application package and any highway improvement agreement
  • The civil engineer's estimate split between state right of way and city right of way
  • Each city's permit conditions, bond form and cost estimate rules
  • Developer and guarantor financial statements for the surety
  • The general contractor's contract and any bond it furnishes to the developer
  • Current certificates and additional insured endorsements for the contractor's policies

What to Ask the Insurer or Surety

  • Is this a privately funded permit, and should the developer or the contractor be the principal?
  • Does the Caltrans district expect bonds on the frontage work given its estimated cost?
  • Will the city accept a letter of credit, and does it require its own bond form?
  • What as-built and closure documents must we deliver before each bond is released?
  • Does any of the trench work trigger a Cal/OSHA permit the underwriter will ask about?
  • Which open permit bonds in other California cities will the surety count against this request?
Quick Answer

Caltrans guidance calls for a 50 percent performance bond and a 100 percent payment bond on the estimated cost of privately funded work in the state highway right of way, with the State as sole obligee; cities such as San Diego and Los Angeles set separate rules.

Common Mistake

Planning to use a letter of credit for the whole frontage. Caltrans does not accept letters of credit or property bonds, so the highway portion usually needs a surety bond.

Broker Perspective

Signal and structure bonds on Caltrans permits stay open until accurate as-builts are accepted, so the record drawing set belongs on the project closeout schedule from day one.

Coverage Impact

The additional insured endorsement Caltrans asks for may not match a contractor's standard endorsement, and whether the policy responds to a permit-related claim depends on the form and the facts.

City Requirements in California

The Same Requirement in Other States

Questions Buyers Ask

What percentage of the work does Caltrans make us bond on a private encroachment permit?

Caltrans guidance for privately funded projects without a highway improvement agreement calls for a payment bond at 100 percent and a performance bond at 50 percent of the estimated construction cost of the work inside the state highway right of way. The bonds name only the State as obligee. Signal and structure work carries a performance bond of at least $10,000.

Our utility client is exempt from Caltrans bonding. Does that exemption cover us as its contractor?

Not automatically. The manual says public utilities are not normally required to bond, but a district can require bonds after poor performance, and the exemption follows the permittee. If your firm is named on the permit or works under a separate permit, read its bond conditions. Contractors for local agencies have a specific exception only when they bond to that agency for the full project.

Does the City of San Diego require a bond for every right-of-way permit?

No. Information Bulletin 126 exempts standard public improvement permits on the City's construction plan template, projects with a construction cost estimate under $100,000 and permits issued to government agencies. Above that, the City accepts a performance bond, cash bond, improvement agreement bond or letter of credit, and a bond must use form DS-401 from an A-rated surety.

What does Los Angeles require before we can pull a sewer permit in the street?

You must be on the Bureau of Engineering's bonded sewer contractor list under LAMC §64.15. That takes evidence of general liability insurance, a surety or cash bond in the amount set by §64.15.1(b), an A, B, C-36 or C-42 license, current City business tax registration and a notarized authorization form. Approval lasts one year and must be renewed.

How long will a Caltrans encroachment bond stay open after we finish?

Expect it to run past completion. The manual says most performance and payment bonds expire a year after Caltrans accepts the work, fees are collected before release and as-built plans must be accepted first. Signal and structure bonds are held until accurate as-builts are furnished. Send the notice of completion and as-builts promptly to start that clock.

Official Sources

  1. Caltrans Encroachment Permits Manual, Chapter 200 (§201.2, §203.3, §203.4, §203.5, §206.2; rev. 09/2023), California Department of Transportation. 50/100 percent bonds with State as sole obligee; no letters of credit or property bonds; cash limits; $5,000 public works threshold; $10,000 signal and structure bonds; utility and local agency exemptions (S&H Code §678, §679); claims on bonds; release after fees and as-builts; one-year expiry; additional insured endorsement; Cal/OSHA permit under Labor Code §6500 Verified 2026-10-24.
  2. City of San Diego Information Bulletin 126 (SDMC §129.0702, §129.0119), City of San Diego Development Services Department. Right-of-way permit surety, exemptions including the $100,000 cost estimate threshold, accepted forms, engineer's estimate, A-rated surety and DS-401, release and 75 percent partial release limit Verified 2026-10-24.
  3. City of Los Angeles Bonded Sewer Contractor Information Package (LAMC §64.15, §64.15.1(b)), City of Los Angeles Bureau of Engineering. Only bonded sewer contractors may obtain sewer permits in the right of way; one-year approval; general liability evidence; surety or cash bond; bond amount effective July 1, 2026; license classifications Verified 2026-10-24.

Reviewed by the Principal, Gleason Insurance Brokers, LLCUpdated

Bring the Contract and the Exhibits.

Share the project, the contract insurance exhibit and any bond or lender requirements. A licensed broker may review them as a courtesy when available, before anything is quoted. See how a project review works or who runs this site.

Full disclaimer about contract and insurance reviews

Contract and insurance reviews are a courtesy service that may be available at times, depending on our workload and on the size, timing and complexity of the project. A review is not guaranteed and is limited to insurance considerations. It is not legal advice and is not a substitute for advice from your own legal counsel, which you may need before signing a contract or obtaining coverage.