California airport construction

Los Angeles World Airports Construction: Bonds, Insurance and Airside Rules

Los Angeles World Airports, the City of Los Angeles Department of Airports, posts a construction Special Provisions template that calls for a faithful performance bond at 100 percent of the contract price, kept in force for the longer of the warranty period or one year after acceptance, and requires the prime to self-perform at least 20 percent of building work or 35 percent of civil work. LAWA's Risk Management supplement asks for insurers rated A- with a financial size of at least IV, a workers' compensation waiver of subrogation and completed operations additional insured endorsements. The template is undated and LAWA's only published wrap-up record we found dates from 2012, so the current solicitation controls.

A two-story steel-framed commercial building under construction with concrete stair cores, a telehandler and a contractor's utility truck on the site

Key Decision Points

  1. LAWA is the City of Los Angeles Department of Airports, governed by the Board of Airport Commissioners, and its specs modify the Greenbook.
  2. The undated Special Provisions template sets a 100 percent faithful performance bond, held for the longer of the warranty period or one year after acceptance and due within 30 days of award.
  3. Primes self-perform at least 20 percent of building work or 35 percent of civil work, and may require subcontractor bonds from an admitted surety.
  4. Risk Management asks for A- / IV insurers, a WC 04 03 06 waiver and ongoing and completed operations additional insured endorsements, with no blanket endorsement unless the firm contracts with LAWA directly.
  5. A 2012 status report shows an OCIP on past work; no current OCIP or rolling wrap-up manual was found, so check each solicitation.
  6. LAWA runs a construction project labor agreement, a Bond Assistance Program and a $5 billion MATOC with SBE, DVBE, LBE and LSBE goals.

LAWA Is a City Department with Its Own Board

The Special Provisions template defines the agency as the City of Los Angeles, Department of Airports, also known as Los Angeles World Airports. The Board of Airport Commissioners is the governing board, and some contracts also need City Council approval. Under the template's contract bonds clause, the Executive Director acts in place of the Board in approving surety bonds.

LAWA construction specifications are written as amendments to the Standard Specifications for Public Works Construction, the Greenbook. The template we read is built on the 2009 edition and carries no date of its own, and its insurance and bond language reflects that age. Its own instructions also show it is a working template, with bracketed notes for the project engineer and blank submittal dates, so the terms in a real bid package can differ.

Treat everything below as the baseline LAWA has published, not as the terms of a particular contract. Each solicitation's special provisions, insurance requirements and bond forms control, and they should be read before insurance or surety capacity is committed.

A Performance Bond That Runs Past Acceptance

Subsection 2-4 of the template replaces the Greenbook's bond paragraph with LAWA's own: "The Faithful Performance Bond shall be for one hundred percent (100%) of the Contract price." The contractor must keep that bond in full effect for the warranty period or one year after the Executive Director accepts the work, whichever is longer, as security for correcting defects in materials or workmanship LAWA reports within that time. All bonds are due within 30 days of the Notice of Award.

The extended term matters to the surety. A LAWA performance bond can stay open for a year or more after acceptance, and a longer specified warranty extends it further, which can tie up capacity the contractor would otherwise use on its next bid. The template we read does not state the payment bond percentage in the passages we checked, so confirm it in the bond forms issued with the solicitation.

Retention can come back in stages. When LAWA issues a Statement of Partial Acceptance, it may release part of the retention on that portion if partial final inspection corrections are complete, the contractor requests release with a verifiable valuation, affected subcontractors, major suppliers and the contractor's surety agree in writing and a change order states the amount. Where minor cleanup items remain, twice their value is held back.

Self-Performance and Subcontractor Bonds

Subsection 2-3.2 requires the prime to perform with its own organization at least 20 percent of the contract price for building work and 35 percent for civil work. General provisions, profit, bonds and supervision do not count toward that share. A general contractor that typically subcontracts most trades needs to plan its self-performed scope before bid, and the self-performed work shapes its own insurance exposure.

Under 2-3.6, a prime may ask subcontractors for performance and payment bonds from an admitted surety naming the prime as obligee, and may reject a subcontractor that does not furnish them. The subcontractor bears the bond cost only if the prime's written or published request for sub-bids says so and clearly states the amount and requirements of the bonds. A violation of the subcontracting rules can lead to cancellation or a penalty of up to 10 percent of the subcontract involved.

Insurance: The Template Lines and the Risk Management Supplement

Subsection 7-3.2 of the template lists aviation or airport liability or, as an alternative, general liability covering premises and operations, contractual liability, independent contractors, products and completed operations, broad form property damage, personal injury and explosion, collapse and underground hazards. It adds auto liability for owned, non-owned and hired vehicles if the contractor's operations require licensed vehicles on the airport, and employer's liability. No limits appear in the template; it points to the Insurance Requirements of the contract documents and lets the Executive Director revisit limits annually and require adjustments.

The template also asks that the City, LAWA and their officers, employees and agents be included as insureds, that coverage be primary and noncontributing, that policies carry a severability of interest clause and contractual endorsement, and that cancellation or reduction take 30 days' written notice to the City Attorney by certified mail. If a contractor lets coverage lapse, LAWA may buy it and charge the cost plus 15 percent.

LAWA Risk Management's Insurance Requirements supplement (Revision 10/2022, marked draft) adds detail. That form is written for air carrier operating permits rather than construction contracts, so treat it as an indication of LAWA's standards, not a contract term:

  • Insurers rated AM Best A- or better with a financial size of at least IV
  • Workers' compensation waiver of subrogation naming LAWA (WC 04 03 06 or similar)
  • Additional insured endorsements for ongoing and products-completed operations
  • Evidence on an ACORD certificate or a certified copy of the policy
  • No blanket or automatic additional insured endorsement unless the firm has a direct contract with LAWA
  • Auto limits for vehicles with airfield access far above those without it; confirm the figure in the contract

Wrap-Up Status: An OCIP on Record in 2012, Nothing Current Published

LAWA has used an owner controlled insurance program before. An Airports Development Group project status report dated November 30, 2012, has an OCIP section, notes coordination with Risk Management to verify OCIP coverage for damages from a waterline break and lists an ARB OCIP credit change order on the Bradley West contract. The PLA extension packet also anticipates one, with a clause that begins, "Should the City institute an Owner Controlled Insurance Program."

We did not find a current OCIP or rolling wrap-up manual on LAWA's site, so this page does not say whether today's projects are wrapped. When a solicitation includes a wrap, the program manual sets which lines it provides, what the contractor still carries and how insurance cost is excluded from or credited against the bid. When it does not, the contractor's own program has to meet the insurance requirements on its own.

Airside Work, Closures and FAA Safety Rules

The template requires contractors to comply with FAA Advisory Circular 150/5370-2C, Operational Safety on Airports During Construction, along with LAWA's own rules. The C edition is several revisions old, another sign of the template's age; check which edition the solicitation names.

Closures need planning. The template asks for at least 48 working hours' notice before any closure, bars closing streets or the AOA without LAWA's express written permission and calls for lighted X markers on runway closures. Badging and escort terms for construction crews were not in the documents we read, so take them from the solicitation and LAWA's security office.

Labor Agreement, Small Business Goals and Surety Support

LAWA has a construction project labor agreement. We read its extension packet, effective January 1, 2011, and updated December 1, 2016, which ran through December 31, 2020. A PLA local hire report through May 2025 shows the agreement is still applied to active projects. Confirm whether the agreement applies to a given contract.

A multiple award task order contract program approved by City Council on February 19, 2025, totals $5 billion across 51 agreements with 31 prime contractors, valid for five years with two one-year options. Its goals are 30 percent SBE, 3 percent DVBE, 20 percent LBE and 15 percent LSBE participation. The template lists the DBE acronym, but we did not verify LAWA's current federal DBE approach, so check the solicitation.

LAWA's Bond Assistance Program offers surety companies support on bid, performance and payment bonds for local contractors and subsidizes CPA-prepared financial statements. A 2021 Contractor Financial Assistance Program offered loans of up to $250,000 to small, local and diverse construction firms. These programs are LAWA's; a contractor applies to LAWA directly, and the surety still underwrites the bond.

The Capital Program by Approved Action

LAWA describes its work as a $30 billion capital improvement program. That figure is LAWA's description rather than a single approval. A dated action: on November 13, 2025, LAWA reported that the Board of Airport Commissioners approved $1 billion in additional funding for the final phase of the ATMP Roadway Improvement Project, built by the Skanska-Flatiron joint venture.

Large phased programs like this one tend to produce long performance bond tails and overlapping insurance terms, so track which contract and which edition of the documents each package uses.

Before You Ask for a Quote

What to Gather

  • The solicitation's special provisions, insurance requirements and bond forms
  • A self-performance plan showing the 20 or 35 percent share
  • Scheduled additional insured endorsements for ongoing and completed operations
  • Workers' compensation waiver of subrogation naming LAWA
  • Insurer AM Best ratings and financial size categories
  • Subcontractor bond requests stating amount and who pays

What to Ask the Insurer or Surety

  • Is this contract enrolled in an owner or rolling wrap-up program?
  • How long is the specified warranty, and how long will the performance bond stay open?
  • What payment bond amount and bid security does this solicitation require?
  • What auto limit applies to vehicles with airfield access?
  • Does the project labor agreement apply to this contract?
  • Which small business goals apply, and does LAWA's Bond Assistance Program fit our firm?
Quick Answer

LAWA's undated Special Provisions template calls for a 100 percent performance bond held for the longer of the warranty period or one year after acceptance, due within 30 days of award, and 20 or 35 percent self-performance. Risk Management asks for A- / IV insurers and completed operations additional insured endorsements.

Common Mistake

Sending a blanket additional insured endorsement. LAWA's supplement says a blanket or automatic endorsement is not accepted unless the firm has a direct contract with LAWA.

Broker Perspective

A performance bond that stays open past acceptance can hold surety capacity for a year or more, which can affect what a contractor bids next.

Coverage Impact

Without a published current wrap, a contractor's own general liability, auto and employer's liability typically need to meet LAWA's terms, including completed operations endorsements.

The Same Requirement in Other States

Questions Buyers Ask

How large is the performance bond on LAWA construction contracts?

The Special Provisions template sets the faithful performance bond at 100 percent of the contract price, kept in force for the longer of the warranty period or one year after acceptance. The template is undated, so confirm in the solicitation.

When are bonds due on LAWA contracts?

The template requires all bonds within 30 days of the Notice of Award, and the Executive Director approves surety bonds in place of the Board.

How much work must LAWA prime contractors self-perform?

At least 20 percent of the contract price for building work and 35 percent for civil work, not counting general provisions, profit, bonds or supervision.

Does LAWA accept a blanket additional insured endorsement?

Its Risk Management supplement says a blanket or automatic endorsement is not acceptable unless the firm has a direct contract with LAWA. Scheduled endorsements for ongoing and completed operations are the safer submission.

Does LAWA use an OCIP?

LAWA has used one; a November 2012 status report describes OCIP coverage and an OCIP credit on the Bradley West contract. We found no current wrap manual, so check each solicitation.

Does LAWA help contractors with bonding?

Its Bond Assistance Program offers surety companies support on bid, performance and payment bonds for local contractors and helps pay for CPA-prepared statements. The surety still makes the underwriting decision.

Official Sources

  1. Construction Special Provisions template (undated; SSPWC 2009 edition), Los Angeles World Airports. Agency and Board definitions; 100 percent performance bond, term and 30-day filing (2-4); 20/35 percent self-performance (2-3.2); subcontractor bonds and penalties (2-3.6, 2-3.8); partial retention release; insurance lines and terms (7-3.2); FAA AC 150/5370-2C and closures (7-10) Verified 2026-10-26.
  2. Insurance Requirements and Risk Management supplement (Rev. 10/2022, draft), Los Angeles World Airports Risk Management. AM Best A- and financial size IV; WC 04 03 06 waiver; ongoing and completed operations additional insured; ACORD or certified policy; no blanket endorsement without a direct contract; higher auto limits with airfield access Verified 2026-10-26.
  3. Airports Development Group Project Status Report (November 30, 2012), Los Angeles World Airports. OCIP section; OCIP coverage on a waterline break; ARB OCIP credit on Bradley West Verified 2026-10-26.
  4. Bond Assistance, Los Angeles World Airports. Bid, performance and payment bond support to sureties; CPA statement subsidies Verified 2026-10-26.
  5. Contractor Financial Assistance Program release (May 20, 2021), Los Angeles World Airports. Loans of up to $250,000 for small, local and diverse construction firms Verified 2026-10-26.
  6. Project Labor Agreement extension packet, Los Angeles World Airports. PLA extension dates; OCIP clause Verified 2026-10-26.
  7. PLA Local Hire Report through May 2025, Los Angeles World Airports. PLA applied to active projects through May 2025 Verified 2026-10-26.
  8. MATOC release (February 19, 2025), Los Angeles World Airports. $5 billion MATOC, 51 agreements, 31 primes, term and SBE, DVBE, LBE and LSBE goals Verified 2026-10-26.
  9. ATMP Roadway Improvement Project funding release (November 13, 2025), Los Angeles World Airports. $30 billion program description; $1 billion Board approval; Skanska-Flatiron JV Verified 2026-10-26.

Reviewed by the Principal, Gleason Insurance Brokers, LLCUpdated

Bring the Contract and the Exhibits.

Share the project, the contract insurance exhibit and any bond or lender requirements. A licensed broker may review them as a courtesy when available, before anything is quoted. See how a project review works or who runs this site.

Full disclaimer about contract and insurance reviews

Contract and insurance reviews are a courtesy service that may be available at times, depending on our workload and on the size, timing and complexity of the project. A review is not guaranteed and is limited to insurance considerations. It is not legal advice and is not a substitute for advice from your own legal counsel, which you may need before signing a contract or obtaining coverage.