Airport and port construction

Port of Oakland: OCIP, Bonds and the Maritime and Aviation PLA

Port of Oakland bid notices from 2024 show an owner-controlled insurance program providing general liability, workers' compensation, employer's liability and contractor's pollution coverage, while the contractor still provides builder's risk and auto liability for its own vehicles and equipment. The same notices require performance and payment bonds, allow securities in place of retention and bind union and nonunion bidders alike to the Port's Maritime and Aviation Project Labor Agreement. Each solicitation confirms whether the OCIP applies and sets the bond amounts, so read the project manual before pricing.

A two-story steel-framed commercial building under construction with concrete stair cores, a telehandler and a contractor's utility truck on the site

Key Decision Points

  1. The owner is the City of Oakland acting through its Board of Port Commissioners, which runs both the seaport and Oakland International Airport.
  2. 2024 bid notices describe an OCIP providing GL, workers' compensation, employer's liability and contractor's pollution, administered by Alliant.
  3. The contractor still provides builder's risk, auto liability for its own vehicles and equipment and other coverage listed in Document 00700, Article 4.
  4. Performance and payment bonds are required; the 2024 seaport notice does not state the bond amount.
  5. Securities may be substituted for retention under the procedure the seaport notice cites in Document 00680.
  6. The MAPLA binds union and nonunion bidders; its 2016 renewal set a $150,000 threshold and a December 2020 action extended it five years.

The Owner and the Contract Documents

The Port of Oakland is the City of Oakland acting through its Board of Port Commissioners. The same Port runs the seaport and Oakland International Airport, so a contractor can see the same owner, contract documents and labor agreement on a terminal job and on an airfield job.

The Port's 2024 bid notices say its Standard Contract Provisions, February 2015 edition, are incorporated by reference into project manuals under Ordinance 4576 and Port Administrative Code Chapter 5.12. That document was too large for us to read, so its bond and insurance sections are not summarized here; get it with the project manual and read it alongside the project's own Document 00700.

The 2024 seaport notice also requires a California Class A contractor's license before award and registration with the Department of Industrial Relations. Both are bidder obligations the Port enforces, not steps a broker can complete for a firm.

The OCIP in the 2024 Bid Notices

Two Port of Oakland bid notices from 2024 describe the owner-controlled insurance program. One was a seaport switchgear project at the former Oakland Army Base, estimated at $8,828,000 and funded in part by a Maritime Administration (MARAD) Port Infrastructure Development Program grant. The other was an airport perimeter dike project estimated at $51,000,000 with FAA Airport Improvement Program funding. The seaport notice states that the OCIP will provide general liability, workers' compensation, employer's liability and contractor's pollution legal liability insurance with Alliant as administrator, and the airport notice carries the same wording on what the contractor still provides.

These are 2024 notices, and the bids have closed. The Port can change or replace a wrap-up program, and a given project can fall outside it, so each solicitation confirms whether the OCIP applies. The notices we read do not publish the OCIP's limits, deductibles or enrollment steps; those come from the project manual and the program's own insurance manual.

For an enrolled firm, the OCIP generally replaces its own policies for on-site work on that project for the lines the program provides. Off-site operations, the firm's other jobs and lines outside the program stay with the firm's own insurance.

What the Contractor Still Carries

The 2024 notices state that the contractor will be required to provide builder's risk insurance, automobile liability for the contractor's vehicles and equipment and other coverage listed in Document 00700, Article 4. Builder's risk on an owner job with an OCIP is a contractor cost here, which differs from some wrap-ups where the owner buys the property coverage.

How insurance costs are treated in the bid price, and whether enrolled subcontractors must remove their own insurance cost from their quotes, is set by the solicitation and the OCIP manual. We did not find a published bid-net rule for the Port, so read the bid form instructions before carrying a figure.

Subcontractors need the same attention. A trade that is enrolled for general liability and workers' compensation can still need its own auto, equipment and any coverage Article 4 lists, and its certificate should show those lines when it mobilizes.

Performance and Payment Bonds and Retention Securities

The 2024 seaport notice states that a performance bond and a payment bond are required for the contract. It does not give the bond amount, so take the penal sums and the bond forms from the project manual.

The same notice allows the contractor to substitute securities for retention monies withheld, citing Section 22300 of the California Public Contract Code and Document 00680. Substituting securities can free working capital on a long airfield or terminal job, but the request has to follow the Port's form and escrow terms.

Sureties writing Port work typically weigh backlog, the size of the job against the firm's largest completed contract and any federal grant schedule. Bonds are credit extended by the surety, not insurance for the contractor.

The Maritime and Aviation Project Labor Agreement

The 2024 seaport notice says the successful bidder, whether union or nonunion, must comply with Document 00823R1, the Maritime and Aviation Project Labor Agreement (MAPLA), and sign a letter of assent. On that grant-funded project, wages were the higher of the federal Davis-Bacon rate and the state prevailing wage rate.

The Port's January 29, 2016, announcement of the renewed MAPLA described a simplified coverage threshold of $150,000 and above, capital program construction and on-haul and off-haul trucking within scope. A December 24, 2020, Port release reported a five-year extension. We could not verify whether the agreement was renewed again after that term, so check the version named in the solicitation.

For a nonunion firm, the letter of assent and the agreement's terms can change crew cost and staffing, and those terms belong in the estimate from the start.

For trucking firms and contractors hauling in and out of the Port, see truck fleet coverage for East Bay haulers.

Federal Grant Terms on Airport and Seaport Work

Federal money adds federal contract terms. The 2024 airport dike notice carried the FAA's disadvantaged business enterprise rules under 49 CFR Part 26 and stated a small business contract-specific goal of 3 percent. The seaport switchgear notice carried MARAD grant terms, the federal uniform grant requirements in 2 CFR 200 and 1201 and Buy America provisions.

Those terms differ by funding source and by year, and the U.S. Department of Transportation revised its DBE program rules by interim final rule in 2025, so the goal and good faith effort rules in a current solicitation can differ from the 2024 notices. Read the federal provisions in each project manual rather than relying on an earlier bid.

Waterside Exposures and Terminal Access

The bid notices we read do not mention USL&H, the Jones Act or maritime employers liability; any such requirement would sit in Document 00700, which we did not read. The federal Longshore Act can apply to work over or next to navigable water depending on the facts, so a firm with pier, wharf or dredging scope should settle that question with its carriers before bidding.

The TSA says TWIC is required under the Maritime Transportation Security Act for workers who need access to secure areas of maritime facilities and vessels. The Port's notices set no TWIC rule for construction crews, and terminal work inside secure areas typically needs TWIC holders or escorts depending on the facility, so confirm access rules with the Port and the terminal operator.

Before You Ask for a Quote

What to Gather

  • The project manual, including Document 00700, Article 4 and the OCIP insurance manual
  • The Port's Standard Contract Provisions, February 2015 edition
  • California Class A license and DIR registration records
  • Builder's risk and auto policies the contractor must provide
  • Surety capacity letter for the bond amounts the solicitation sets
  • MAPLA documents and a letter of assent plan for union and nonunion crews

What to Ask the Insurer or Surety

  • Does the OCIP apply to this solicitation, and what limits and deductibles does it carry?
  • How must insurance costs be shown or removed in the bid price?
  • What builder's risk limit and deductible does Article 4 require of the contractor?
  • What bond amounts and forms does the project manual set?
  • Can we substitute securities for retention, and what escrow form does the Port use?
  • Which federal funding terms, DBE goal and Buy America rules apply to this project?
Quick Answer

In 2024 Port of Oakland bid notices, an OCIP provided GL, workers' compensation, employer's liability and contractor's pollution, while contractors provided builder's risk and auto. Bonds were required, retention securities were allowed and the MAPLA applied to union and nonunion bidders.

Common Mistake

Assuming the OCIP includes builder's risk. The 2024 notices put builder's risk and the contractor's own auto liability on the contractor.

Broker Perspective

Because the Port runs both the seaport and the airport, one firm can face the same OCIP and MAPLA terms on very different jobs, with federal terms that change by funding source.

Coverage Impact

Enrollment typically replaces a firm's own on-site general liability and workers' compensation for that project, but off-site work, auto and builder's risk stay with the contractor's program.

The Same Requirement in Other States

Questions Buyers Ask

Does the Port of Oakland use an OCIP?

Port bid notices from 2024 describe an OCIP providing general liability, workers' compensation, employer's liability and contractor's pollution, administered by Alliant. Each solicitation confirms whether it applies.

What insurance must a contractor still buy on a Port of Oakland OCIP job?

The 2024 notices list builder's risk, auto liability for the contractor's vehicles and equipment and other coverage in Document 00700, Article 4.

Are bonds required on Port of Oakland construction contracts?

The 2024 seaport notice requires a performance bond and a payment bond. It does not state the amount, so take the penal sums and forms from the project manual.

Can a contractor substitute securities for retention at the Port of Oakland?

Yes, the 2024 seaport notice allows securities in place of retention monies under Public Contract Code Section 22300 and Document 00680.

Does the Port of Oakland project labor agreement apply to nonunion contractors?

The 2024 seaport notice says the successful bidder, union or nonunion, must comply with the MAPLA and sign a letter of assent. Check the version named in each solicitation.

Official Sources

  1. Notice of Solicitation of Bids, Project 4355 (2024), Port of Oakland. OCIP lines and Alliant administrator; contractor-provided builder's risk and auto; performance and payment bonds; retention securities under PCC 22300; MAPLA for union and nonunion bidders; Class A license and DIR; MARAD PIDP grant, 2 CFR 200 and 1201 and Buy America; $8,828,000 estimate Verified 2026-10-26.
  2. Notice of Solicitation of Bids, Project 4352, Airport Perimeter Dike (2024), Port of Oakland. Same OCIP and contractor insurance wording; FAA AIP funding; 49 CFR Part 26 terms and 3 percent small business goal; $51,000,000 estimate; Standard Contract Provisions (February 2015) incorporated by Ordinance 4576 and Administrative Code Chapter 5.12 Verified 2026-10-26.
  3. Port of Oakland renews Maritime and Aviation Project Labor Agreement (January 29, 2016), Port of Oakland. MAPLA renewal; $150,000 coverage threshold; capital program construction and on-haul and off-haul trucking in scope Verified 2026-10-26.
  4. Port of Oakland Board extends Project Labor Agreement 5 years (December 24, 2020), Port of Oakland. Five-year MAPLA extension in December 2020 Verified 2026-10-26.
  5. Transportation Worker Identification Credential (TWIC), Transportation Security Administration. TWIC required under the Maritime Transportation Security Act for workers who need access to secure areas of maritime facilities and vessels; $127 new-applicant fee; five-year validity Verified 2026-10-26.

Reviewed by the Principal, Gleason Insurance Brokers, LLCUpdated

Bring the Contract and the Exhibits.

Share the project, the contract insurance exhibit and any bond or lender requirements. A licensed broker may review them as a courtesy when available, before anything is quoted. See how a project review works or who runs this site.

Full disclaimer about contract and insurance reviews

Contract and insurance reviews are a courtesy service that may be available at times, depending on our workload and on the size, timing and complexity of the project. A review is not guaranteed and is limited to insurance considerations. It is not legal advice and is not a substitute for advice from your own legal counsel, which you may need before signing a contract or obtaining coverage.