My Contractors Insurance Quote
Insurance and bond topics: Project Liability Insurance, Pollution Liability, Builder’s Risk, Performance & Payment Bonds, Subdivision Bonds, Wrap-Ups, CA · TX · AZ · NV
Skip to main content

Airport and Seaport Construction

Insurance, Wrap-Ups and Bonds for Airport and Seaport Construction

Airports and seaports are public owners with large capital programs, and their projects add requirements most public work does not: owner-controlled or rolling wrap-up programs that change what a contractor carries, higher auto limits for driving airside, security badging and escorts, and marine exposures for work over or next to the water. Payment and performance bonds still follow each state's public works statute, and each owner's solicitation and program manual control the details; placement remains subject to underwriting and the surety.

A two-story steel-framed commercial building under construction with concrete stair cores, a telehandler and a contractor's utility truck on the site

Key Decision Points

  1. Several owners run wrap-up programs: DFW's rolling program (2020 manual) leaves workers' compensation and auto with the contractor, while Austin's ROCIP AUS publishes a master workers' compensation policy.
  2. Airside driving can carry much higher auto limits than landside work, such as Phoenix Sky Harbor's $5 million combined auto and umbrella requirement for driving on the airfield.
  3. Contractors on airports typically badge their workers through the airport's security program and follow construction safety and phasing rules for work near active runways and taxiways.
  4. Port work over or next to navigable water can raise Longshore Act, maritime and vessel exposures that a standard contractor program may not address.
  5. Public works bond statutes still apply: Texas Government Code chapter 2253, A.R.S. 34-222 in Arizona and NRS 339.025 in Nevada.

Why Airport and Port Work Differs from Other Public Projects

An airport or port is usually run by a department, board or authority that is separate from the general city or county procurement office, with its own contract documents, insurance exhibits and security program. Work happens around aircraft, passengers, cargo and vessels that keep operating during construction, so owners add rules about where crews can drive, who can enter secure areas, how debris is controlled and how phases are sequenced. Large capital programs are often insured through an owner wrap-up, which changes both what a contractor buys and how it prices a bid.

For a general contractor or trade contractor used to city or school work, the result is a different set of questions before bidding: whether the project is enrolled in a wrap and what is left outside it, what auto and umbrella limits apply to airside or waterside work, whether marine coverages are required, and which labor and small business programs apply to the funding source.

Owner Wrap-Up Programs on Airport and Port Work

Wrap-ups are common on airport and port capital programs, but they are not the same from one owner to the next. DFW Airport's rolling owner-controlled program, in the 2020 manual edition, is mandatory and priced bid-net and leaves workers' compensation and auto with the contractor. Austin-Bergstrom's ROCIP AUS publishes master workers' compensation, general liability, excess and contractors environmental policies. San Diego's airport authority runs an owner-controlled program for on-site work, while its New Terminal 1 project used a separate contractor-controlled program. The Port of Oakland's 2024 bid notices describe an owner program for liability, workers' compensation and pollution, with builders risk and auto left to the contractor.

Every wrap leaves something outside it, typically auto, off-site work, tools and equipment and the contractor's own corporate program for work not enrolled. Enrollment, deductibles, bid-net pricing and completed operations terms are set in the program manual and the solicitation, and older manuals should be confirmed against the current version before bidding.

Texas: DFW, Houston, Austin and Port Houston

DFW Airport runs its own rolling wrap with separate airfield auto requirements. Houston Airport System work is let under the City of Houston's general conditions, which set insurance minimums, 100 percent payment and performance bonds and retainage. Austin-Bergstrom's expansion runs under ROCIP AUS, with City Council approval of the program administrator in March 2026. Port Houston chooses its procurement method under the Water Code and sets its own design-build bond rules. Government Code chapter 2253 sets the state bond thresholds, and Insurance Code chapter 151 limits some additional insured requirements outside consolidated programs.

  • DFW Airport: rolling wrap and airside auto limits
  • Houston Airport System: City of Houston contract terms and badging
  • Austin-Bergstrom: ROCIP AUS
  • Port Houston: procurement and design-build bonds

California: San Diego, Los Angeles and Oakland

San Diego International Airport's authority sets safety qualification and airside rules alongside its owner program. Los Angeles World Airports publishes bond and insurance terms, including performance bond and surety rating requirements, and runs a bond assistance program for smaller local contractors. The Port of Los Angeles requires Longshore Act coverage for work in or over the water, and the Port of Oakland combines an owner program with a maritime and aviation project labor agreement.

  • San Diego International Airport
  • Los Angeles World Airports (LAX)
  • Port of Los Angeles
  • Port of Oakland

Arizona and Nevada: Phoenix, Tucson and Harry Reid

Phoenix Sky Harbor is a City of Phoenix department, and airfield driving carries a $5 million combined auto and umbrella requirement. Tucson International is run by the Tucson Airport Authority, which procures construction under Arizona's Title 34 and requires bid security. Harry Reid International is run by the Clark County Department of Aviation, which says it runs a construction wrap program and requires contractors to vet workers for badges. Arizona requires 100 percent performance and payment bonds on public works, and Nevada sets bonds of not less than 50 percent on larger contracts.

  • Phoenix Sky Harbor
  • Tucson International Airport
  • Harry Reid International Airport

Airside Work, Security Badging and Auto Limits

Work inside an airport's air operations area brings requirements a landside job does not. Airports run security programs under federal rules, so workers typically need fingerprinting, background checks and a badge, or an escort, before they can work in secure areas. Construction near runways and taxiways follows a safety and phasing plan, with debris control and limits on equipment height and location.

Insurance follows the exposure. Some owners require much higher auto limits for vehicles driven airside, and some require that the auto policy not exclude airport premises. A contractor's usual $1 million auto limit and umbrella may fall short of an airfield requirement, and subcontractors who drive on the airfield may face the same requirement.

Waterside Work and Marine Exposures

Port construction often happens on wharves, piers and docks or from barges. The federal Longshore and Harbor Workers' Compensation Act can apply to work over or next to navigable water depending on the facts, and a state workers' compensation policy may not respond to those claims without an endorsement. Work from vessels can raise Jones Act and maritime employers liability questions, and work over water raises vessel and pollution exposures. Port workers who need unescorted access to secure maritime areas typically need a TSA Transportation Worker Identification Credential.

Which of these a contract requires depends on the port, the solicitation and the scope of work. Contractors moving from upland sitework to port projects should read the insurance exhibit for marine terms before bidding.

Bonds, Labor Agreements and Small Business Programs

Airport and port projects follow the state's public works bond rules or the owner's own enabling law, and some owners add their own: LAWA keeps its performance bond in force for the longer of the warranty period or one year, and Port Houston sets design-build bond amounts by project budget. Several ports use project labor agreements that bind union and nonunion contractors above a threshold. Federally funded airport work carries the federal disadvantaged business enterprise program, and the U.S. Department of Transportation's 2025 interim final rule led some owners, including the Tucson Airport Authority, to stop setting contract goals; each solicitation states the current requirement.

Before You Ask for a Quote

What to Gather

  • The solicitation's insurance exhibit and bond forms
  • The wrap-up program manual and enrollment forms, if a wrap applies
  • Airside or waterside driving and access requirements
  • Any project labor agreement and small business or DBE requirements
  • Subcontractor certificates and auto limits for crews driving airside
  • Current financial statements and work in progress for the surety

What to Ask the Insurer or Surety

  • Is this project enrolled in a wrap-up, and what stays with us?
  • Do our auto and umbrella limits meet the airside requirement?
  • Does any work happen over or next to navigable water?
  • Which state bond statute or owner rule applies?
  • Is the current program manual newer than the one we have?
Quick Answer

Airport and port projects typically add wrap-up enrollment, higher airside auto limits, security badging and marine exposures to the usual public works bond and insurance requirements; each owner's solicitation and program manual control the details.

Common Mistake

Pricing an enrolled project with the full cost of the contractor's own liability program, or assuming a wrap covers auto and off-site work when the manual leaves them with the contractor.

Broker Perspective

We read the wrap manual, the insurance exhibit and the airside or waterside rules together, because each one changes what the contractor carries and how it prices the bid.

Coverage Impact

Owner exhibits set minimums and wording; the wrap policies, the contractor's own policies and endorsements and the surety's underwriting decide what responds.

Questions Buyers Ask

Does an airport wrap-up cover workers' compensation?

It depends on the program. DFW's 2020 manual leaves workers' compensation with the contractor, while Austin's ROCIP AUS publishes a master workers' compensation policy. The program manual sets it.

Why are airside auto limits higher?

Vehicles on an airfield operate around aircraft and passengers, so owners can require larger auto and umbrella limits for vehicles driven there, such as $5 million combined at Phoenix Sky Harbor.

Do port projects require Longshore Act coverage?

Some do. The Port of Los Angeles requires it for work in or over the water. Whether the federal act applies depends on the work and location, and the solicitation states the requirement.

Are payment and performance bonds required on airport projects?

Typically yes, under the state's public works statute or the owner's own law, such as Texas Government Code chapter 2253, A.R.S. 34-222 and NRS 339.025.

Which airports and ports have pages here?

Pages describe owners whose documents could be verified. Others, including SFO, Sacramento, Long Beach and the Port of San Diego, have no page yet because their terms could not be verified.

Official Sources

  1. Texas Government Code Chapter 2253, Texas Legislature. Performance and payment bond requirements for Texas public work contracts. Verified 2026-10-26.
  2. Texas Insurance Code Chapter 151, Texas Legislature. Limits on additional insured requirements in construction contracts and the consolidated insurance program exception. Verified 2026-10-26.
  3. A.R.S. 34-222, performance and payment bonds, Arizona Legislature. 100 percent performance and payment bonds on Arizona public works. Verified 2026-10-26.
  4. NRS Chapter 339, contractors' bonds on public works, Nevada Legislature. Nevada payment and performance bonds of not less than 50 percent on larger public works contracts. Verified 2026-10-26.
  5. Transportation Worker Identification Credential (TWIC), Transportation Security Administration. TWIC requirement for unescorted access to secure areas of maritime facilities. Verified 2026-10-26.
  6. DFW Airport construction, Dallas Fort Worth International Airport. DFW construction program information for contractors. Verified 2026-10-26.

Reviewed by the Principal, Gleason Insurance Brokers, LLCUpdated

Bring the Contract and the Exhibits.

Share the project, the contract insurance exhibit and any bond or lender requirements. A licensed broker may review them as a courtesy when available, before anything is quoted. See how a project review works or who runs this site.

Full disclaimer about contract and insurance reviews

Contract and insurance reviews are a courtesy service that may be available at times, depending on our workload and on the size, timing and complexity of the project. A review is not guaranteed and is limited to insurance considerations. It is not legal advice and is not a substitute for advice from your own legal counsel, which you may need before signing a contract or obtaining coverage.

Next Level Experience

Insurance done right.