Arizona airport construction

Phoenix Sky Harbor Construction: Procurement, Bonds and Airside Insurance

Construction at Phoenix Sky Harbor is bought by the City of Phoenix through its citywide construction procurement, using job order contracts, design-build and construction manager at risk, with City Council approval before award. Arizona law calls for performance and payment bonds each equal to the full contract amount from a non-individual surety, and the Aviation Department's 2025 vehicle and insurance sheet adds a $5,000,000 combined auto and umbrella minimum for any company that drives airside. Contract insurance limits sit in each solicitation, and we found no published wrap-up program for the airport.

A two-story steel-framed commercial building under construction with concrete stair cores, a telehandler and a contractor's utility truck on the site

Key Decision Points

  1. Sky Harbor is run by the City of Phoenix Aviation Department, and a March 2023 Aviation deck says construction is procured by the Street Transportation Department.
  2. Delivery methods named by the Aviation Department are job order contracting, design-build and construction manager at risk.
  3. Several FAA-tagged airside CMAR selections were listed as pending Council approval, which is not an approved award.
  4. A.R.S. 34-222 calls for performance and payment bonds each equal to the full contract amount, with no individual sureties.
  5. The 2025 Aviation sheet for airside driving requires $5,000,000 combined auto and excess or umbrella, at least $1,000,000 of it in auto, and no binders.
  6. We found no official page naming an OCIP, ROCIP or other wrap-up for Sky Harbor; contract insurance terms come from the bid package.

The Owner Is a City Department

Phoenix Sky Harbor International Airport belongs to the City of Phoenix and is operated by the City's Aviation Department. For a contractor, the practical point is that airport construction does not run through a separate airport authority with its own contracting rules. A procurement deck the Aviation Department presented on March 16, 2023, lists construction as "Procured by Street Transportation Department," the City's construction procurement group, while Aviation handles other categories of purchasing.

The same deck walks through the City's solicitation types, including requests for qualifications, invitations for bids and requests for proposals, and places City Council approval inside the procurement cycle. A firm that already bids City street or facilities work will see familiar steps. The City's solicitations site notes that its OpenGov procurement portal launched on April 14, 2025. Current construction solicitations, including aviation work, are posted through the City rather than through a separate airport bid board.

JOC, Design-Build and CMAR at the Airport

The Aviation Department's design and construction opportunities page names the procurement processes it uses for construction: job order contracting, design-build and construction manager at risk. Each method changes when bonds are furnished and how much is bonded. A JOC contractor typically bonds each task order or the contract maximum as the solicitation specifies, while a CMAR firm often provides preconstruction services first and furnishes construction bonds when a guaranteed maximum price is set. The solicitation controls those steps.

The City's tabulations, awards and recommendations page, read for this page, listed several aviation items with a status of pending Council approval. They included a two-step CMAR for TRACON demolition and a West Hold Bay expansion, a two-step CMAR for Taxiway A connector strengthening and reconstruction, an engineering services contract for North Infield paving and drainage tagged FAA and ADOT and an aviation architectural job order contract. Pending Council approval means a recommendation rather than an approved award. The listing showed no dollar values. The FAA tags indicate federal funding on part of the airside work, which typically brings federal contract provisions into the bid documents.

Bonds and Retention Under Arizona Title 34

Because the owner is a city, Arizona's public works statutes in Title 34 apply. A.R.S. 34-222 requires a performance bond and a payment bond, each "in an amount equal to the full contract amount," and says the bonds "shall not be executed by an individual surety or sureties." A contractor whose program relies on an individual surety or a nonadmitted market needs a different surety before bidding Sky Harbor work.

A.R.S. 34-221 governs retention. The statute lets the owner retain 10 percent of each progress estimate and limits later retention to no more than 5 percent once the conditions in the statute are met, and it lets the contractor substitute qualifying securities, such as assigned money market or deposit accounts, for retained amounts. Read the current statute and the contract's payment article for the exact release conditions. Bid security amounts are set in each solicitation.

None of these rules decide whether a surety will support a given job. Capacity, the size of a CMAR guaranteed maximum price against work on hand and indemnity terms come from the surety's own underwriting, subject to the terms of the bonds issued.

The $5,000,000 Auto and Umbrella Rule for Airside Driving

The clearest airport-specific insurance rule we could read is not in a construction contract. It is the Aviation Department's Vehicle Identification and Insurance Information sheet, used by Airport Operations and the Security Badging Office for companies that need to drive on the airfield. The file is labeled as revised in 2025, and it says: "Each company must carry a combined limit of at least $5,000,000 in Automobile Liability and/or Excess or Umbrella Liability," with "At least $1,000,000 of this combined limit" in automobile liability.

The sheet also says the policy "shall not contain any restrictions on coverage concerning operations on or near airport premises," that "Binders are not accepted" and that the City of Phoenix must be endorsed as an additional insured for liability arising from the contractor's activities. Vehicles are identified as owned, non-owned or hired.

This sheet applies to airside driving privileges, not to every Sky Harbor contract. A paving or utility contractor with a $1,000,000 auto policy and a $2,000,000 umbrella can meet a contract exhibit and still fall short of the airside driving rule. Some auto and umbrella forms carry airport or aircraft exclusions, so the policy wording needs a check before the badging office asks for evidence.

Badging, Background Checks and Older Forms

The 2025 sheet says employees must undergo fingerprint-based criminal history records checks, attend the required training and obtain airport badges. Badge lead time, training seats and escort requirements belong in the schedule, especially for trades that start on the airfield in the first weeks.

An older version of the same sheet, from 2009 with later updates, also listed a security threat assessment and a per-vehicle airside vehicle permit for vehicles with temporary logos. We treat the 2025 sheet as controlling and suggest confirming current steps with the Security Badging Office. The badging decision belongs to the City; a broker can assemble certificates and endorsements but cannot badge a firm or speed the process.

No Published Wrap, Plus DBE and Small Business Programs

We found no official City of Phoenix or Sky Harbor page that names an owner-controlled or rolling wrap-up for the airport's capital program. That does not mean one cannot appear on a particular contract; it means a bidder should price its own general liability, workers' compensation, auto, umbrella and any pollution requirement from the solicitation's insurance exhibit unless the bid documents say otherwise. The contract insurance exhibits for current CMAR work sit in the OpenGov packages, which we did not read.

The Aviation Department's opportunities page says small businesses can obtain SBE certification to do business with the City. On FAA-funded work, the federal Disadvantaged Business Enterprise rule in 49 CFR Part 26 applies, and the U.S. Department of Transportation changed that rule through an interim final rule issued on September 30, 2025. We could not read a Phoenix document stating how Sky Harbor now sets contract goals, so check the current solicitation for any DBE or SBE requirement and for labor and wage terms.

Before You Ask for a Quote

What to Gather

  • The solicitation's insurance exhibit, bond forms and bid security terms from the OpenGov package
  • The Aviation Department's 2025 Vehicle Identification and Insurance Information sheet
  • Current auto and umbrella policies with every exclusion endorsement
  • A City of Phoenix additional insured endorsement in the sheet's wording
  • Surety confirmation for 100 percent performance and payment bonds
  • A list of employees and vehicles that need airside access

What to Ask the Insurer or Surety

  • Does our combined auto and umbrella reach $5,000,000 with at least $1,000,000 in auto?
  • Do any of our auto or umbrella forms restrict operations on or near airport premises?
  • Does this contract use a wrap-up, or do we carry our own primary coverage?
  • When does the CMAR or JOC solicitation require bonds to be furnished?
  • What retention and release terms does the contract apply under A.R.S. 34-221?
  • What DBE, SBE and labor terms does this solicitation set?
Quick Answer

Sky Harbor construction is procured by the City of Phoenix through JOC, design-build and CMAR, with A.R.S. 34-222 bonds at the full contract amount and a $5,000,000 combined auto and umbrella minimum for airside driving under the 2025 Aviation sheet.

Common Mistake

Assuming the contract's auto and umbrella limits also satisfy airside driving. The Aviation Department's 2025 sheet sets its own $5,000,000 combined minimum and rejects binders.

Broker Perspective

Airside driving evidence, endorsements and badge timing are typically the first items to slow a Sky Harbor start, so they are worth lining up before the notice to proceed.

Coverage Impact

Auto and umbrella forms with airport or aircraft restrictions can conflict with the sheet's wording; terms can vary by carrier guidelines and programs, subject to underwriting and the policies issued.

The Same Requirement in Other States

Questions Buyers Ask

Who buys construction at Phoenix Sky Harbor?

The City of Phoenix. A March 2023 Aviation Department deck says construction is procured by the Street Transportation Department through citywide construction procurement, with City Council approval in the cycle.

What bonds does a Sky Harbor construction contract need?

A.R.S. 34-222 calls for a performance bond and a payment bond, each equal to the full contract amount, and bars individual sureties. Confirm bid security and bond timing in each solicitation.

What auto limit is needed to drive airside at Sky Harbor?

The Aviation Department's 2025 sheet for airside driving requires a combined $5,000,000 in auto and excess or umbrella liability, with at least $1,000,000 in auto, the City as additional insured and no airport-premises restriction.

Does Sky Harbor use an OCIP or ROCIP?

We found no official page naming one. Bidders should price coverage from each solicitation's insurance exhibit and check the bid documents for any wrap-up terms.

Are DBE goals set on Sky Harbor projects?

FAA-funded work falls under 49 CFR Part 26, which USDOT changed by an interim final rule on September 30, 2025. We could not confirm how Sky Harbor now sets goals, so check the current solicitation.

Official Sources

  1. Tabulations, Awards and Recommendations, City of Phoenix. FAA-tagged aviation CMAR, engineering and JOC items listed as pending Council approval; OpenGov portal launch on April 14, 2025 Verified 2026-10-26.
  2. A.R.S. 34-222, Performance and payment bonds, Arizona State Legislature. Performance and payment bonds each equal to the full contract amount; no individual sureties Verified 2026-10-26.
  3. A.R.S. 34-221, Retention, Arizona State Legislature. 10 percent retention of estimates, later retention capped at 5 percent, substitution of securities Verified 2026-10-26.
  4. Vehicle Identification and Insurance Information (revised 2025), City of Phoenix Aviation Department. $5,000,000 combined auto and umbrella with $1,000,000 auto for airside driving; no airport-premises restriction; binders not accepted; City additional insured; fingerprint checks, training and badges Verified 2026-10-26.
  5. Insurance and Vehicle Permit Requirements (older edition), City of Phoenix Aviation Department. Earlier security threat assessment and airside vehicle permit steps Verified 2026-10-26.
  6. Runway to PHX: Procurement Process (March 16, 2023), City of Phoenix Aviation Department. Construction procured by the Street Transportation Department; solicitation types; City Council approval step Verified 2026-10-26.
  7. Design and Construction Opportunities, City of Phoenix Aviation Department. JOC, design-build and CMAR procurement; SBE certification with the City Verified 2026-10-26.

Reviewed by the Principal, Gleason Insurance Brokers, LLCUpdated

Bring the Contract and the Exhibits.

Share the project, the contract insurance exhibit and any bond or lender requirements. A licensed broker may review them as a courtesy when available, before anything is quoted. See how a project review works or who runs this site.

Full disclaimer about contract and insurance reviews

Contract and insurance reviews are a courtesy service that may be available at times, depending on our workload and on the size, timing and complexity of the project. A review is not guaranteed and is limited to insurance considerations. It is not legal advice and is not a substitute for advice from your own legal counsel, which you may need before signing a contract or obtaining coverage.